Send the form and we contact you within 5 minutes

Plumbing installation in Iļģuciems - toilet, bathroom, kitchen

Plumbing installation in Iļģuciems most often happens in a series-block flat, where the toilet is a separate narrow room with the riser in a box, and next to it the bathroom has a bath, a sink and a washing machine.

After you send the form, we contact you within 5 minutes.

Request to a plumber

After you send the form, we contact you within 5 minutes

Your data is secure and will not be shared with third parties

By submitting this form, you agree to our privacy policy

Average response time: 5 minutes

Each fixture is connected to the existing water supply pipes and the drain. Labour starts from €25 for a mixer tap and from €125 for a shower cabin, fixtures and materials extra.

The sign, the cause and the work that fixes it

What you notice Why it happens What is done Price
Water keeps running into the toilet after flushing the fill valve does not close in time, for example because of a blocked filter, and the extra water leaves through the overflow pipe the valve filter is cleaned or the flush mechanism is replaced from €35
Water stands on the tiles behind the toilet a loose connection to the drains or a crack in the ceramic the connection is checked, and if there is a crack the toilet is replaced from €50
The mixer tap drips even when closed a worn or limescaled ceramic cartridge the cartridge or the whole tap is replaced from €25
The cabinet under the sink is damp a loose trap or a cracked drain pipe the trap is tightened or replaced, and the pipe too if needed from €25/h
The bath enamel is worn, water stays at the edge the bath is worn out or has tilted the old bath out, the new one in its place from €60

The price in the table is labour for one fixture. If several small jobs are done at one visit, the hourly rate can work out cheaper.

Who owns the supply: a series-block flat against a private house

In a series-block flat your part usually starts at the riser. The flat’s valve is at the water meter, usually before the meter, sometimes after it. The toilet, sink, taps and pipes up to the riser are the flat’s equipment, unless the building’s documents say otherwise. The riser in the toilet box is common property of the building, and the building manager shuts it off. If the flat’s valve no longer holds the water, a fixture cannot be replaced until the whole riser is shut off, and that affects the neighbours above and below you.

In a private house everything after the incoming supply pipe belongs to the owner. The water is shut off at the main valve by the incoming pipe, and nobody else is left without water. The drains go through the yard sewer line to the city chamber or a holding tank, so a blockage in a ground-floor toilet is usually to be looked for in the house or the yard, not at a neighbour’s.

Bathroom plumbing in a small room

In a series-block bathroom every centimetre is taken: the bath along one wall, the sink by the door, the washing machine under the sink or next to the bath. So before buying a new fixture, measure not only the space but also where the water supply pipes and the drain come out of the wall. That decides whether the fixture can be connected in the old place or the supply has to be moved.

There are guide heights. If the old sink hung too low or too high, the right height can be chosen for the new one, if the supply pipes allow it.

Guide heights for a flat under the Latvian Building Code LBN 221-15: hand basin edge 800 mm above the floor, a sink next to the bath 850 mm, wall tap 200 mm higher than the basin, bath tap at 800 mm height. Tolerance is up to ±20 mm. Checked 16.11.2026.

A separate toilet with the riser in a box

In a narrow toilet room there is usually a box or a panel behind the toilet through which the water and drain risers run. Both you and the building manager must be able to reach them, so the box must stay openable even after a new toilet or a concealed frame. The toilet’s connection to the drains must not be narrower than 100 mm.

If you are replacing the toilet, see toilet installation. If the toilet is the old one but the cistern or a connection leaks, first read toilet repair: often one part is enough.

Plumbing installation for several fixtures at once

If you are renovating the whole bathroom, the fixtures go in a set order. First the pipes and the drain, because they stay in the wall or the floor, then the tiles. The manufacturers Ravak and Kaldewei put the bath or shower tray in at the finishing stage, when the tiles are done. The sink, the toilet and the mixer taps are connected last.

Each room gets its own trap: LBN 221-15 does not allow a kitchen and a bathroom sink to be joined into one trap.

Jobs better not started yourself

  • Removing a toilet without checking that the flat’s valve holds. If it leaks through, water will come through the open supply, and only the building manager can shut off the riser.
  • Chiselling out an old cast-iron socket. The socket is part of the riser, and a crack in it becomes a problem for the whole building.
  • Tiling over the riser box without an opening. In an emergency the box will have to be broken out.
  • Tightening a tap by force on an old steel pipe. A rusted thread can break off inside the wall.

What the price depends on

The labour price changes with whether the fixture goes in the old place directly on the existing supply pipes, or whether a pipe has to be extended, the drain pipe to the riser replaced or a supply moved. A concealed toilet with a frame is bigger work than a toilet on the floor. If the old flat valve leaks through, replacing it is a separate job before the fixture is replaced, and it needs the riser to be shut off. Prices are labour only; materials are extra. Whether the trip is charged separately, the plumber tells you on the call before the work. All prices are on the page plumbing prices.

Sources

  1. Fixture heights in residential buildings (LBN 221-15) checked 13 November 2026
  2. Minimum diameter of the toilet outlet 100 mm (LBN 221-15) checked 13 November 2026
  3. Fixtures in different rooms must not be connected to one trap (LBN 221-15) checked 13 November 2026
  4. Continuous running into the toilet: dirt or limescale at the flush valve (Geberit) checked 13 November 2026
  5. A dripping mixer tap: the ceramic cartridge (hansgrohe) checked 13 November 2026
  6. Ravak: an acrylic bath is installed in a finished, tiled room checked 16 November 2026
  7. Kaldewei: steel enamel baths and shower trays are fitted at the finishing stage checked 16 November 2026
  8. Ideal Standard: the WC cistern fill valve filter must be cleaned regularly checked 17 November 2026

Prices and rules rechecked 16 November 2026; page text updated 18 November 2026.

Illustration: a kitchen sink in a worktop with a new trap and two angle valves with flexible hoses below
Illustration: a kitchen sink in a worktop with a new trap and two angle valves with flexible hoses below

Job prices in detail

Labour only; materials are extra. The plumber tells you the total before starting.

Job prices in detail
What is done Cost
Mixer tap replacement 1 unit from €25
Sink on the wall or in a worktop 1 unit from €40
Replacing a toilet or adding a new one 1 unit from €50
Assembling and connecting a shower cabin per set from €125

Questions residents ask

Can a new toilet be connected to the old cast-iron socket?

Usually it can, if the socket is not cracked and its inside can be cleaned. A rubber collar or an adapter goes between the toilet outlet and the socket. If the socket is damaged, a section of the riser has to be replaced, and that is agreed with the building manager.

I bought the fixture myself. Can it be installed?

Yes, the price list has labour prices without the fixture. In the form write the make and model, so the plumber knows what fixings and supply connections come in the set.

Can a toilet, a sink and a tap be replaced at one visit?

They can. Write all the fixtures in the form. On the call the plumber talks through the job and the price with you: per fixture or by the hour.

What should I prepare in the flat before the work?

Clear the space around the fixture and the access to the flat’s valves. If the riser box is screwed shut, say so in the form.

Send the job to a plumber

Scroll up to the form at the top; once you send it, we contact you within 5 minutes.

Open the request form
Book a plumber we contact you within 5 minutes