The two are fitted differently: an acrylic bath stands on its own feet and must not be built in, and a steel bath is separated from the mortar by a tape. Placing and connecting the new bath is from €60, and taking away the old bath is a separate job.
What is in the line from €60 per bath
- Included: placing the new bath.
- Included: a trap with an overflow.
- Included: connection to the existing drain.
- Not included: disconnecting, carrying out and taking away the old bath.
- Not included: replacing the mixer tap, from €25 per unit.
- Not included: the drain pipe to the riser, from €30 per connection point.
- Not included: the bath, the panel and the tiles.
If more work turns up during the job (for example a damaged drain inlet under the old bath), the Consumer Rights Protection Centre (PTAC) advises drawing up a record for the additional work with an estimate approved by the customer.
Acrylic against steel: what the makers require
| Question | Acrylic bath (Ravak) | Steel enamel bath (Kaldewei) |
|---|---|---|
| What it stands on | on a reinforced base with adjustable feet; must not be built in rigidly | mortar or adhesive must not touch the lower edge directly; an installation tape is recommended |
| When it is fitted | only in a finished, tiled bathroom | at the finishing stage, and the bath is covered until the work is done |
| Drain | for the Rosa model a 50 mm drain | a drain with a double-lip seal |
| Joint at the wall | a 2–3 mm gap to the tiles, filled with silicone | before the joint the bath is loaded until the joint has dried |
For the Ravak Rosa model the top edge of the bath is 610 mm above the floor (±5 mm), and the wall mixer supply is at 800 mm height. If a panel encloses the bath, an opening is left in one wall for access to the trap and the supply pipes.
Old one out, new one in: the order
- Panel and trap If the old bath sits inside a tiled panel, the panel is knocked down, then the trap is disconnected from the drain inlet.
- Carrying out down the stairs The Iļģuciems residential district was planned with five-storey large-panel sections, and such blocks usually have no lift. A heavy bath is carried down the stairs, so this work has its own price.
- Place for the new bath For an acrylic bath the tiles must already be done. For a steel bath, a support is prepared so that mortar is not put directly against the enamel.
- Placing and the drain The bath is levelled on its feet, and the trap with the overflow and the drain are connected.
- Check before the panel Kaldewei requires the drain to be checked after connection and before the final finish, while the trap can still be reached.
- The joint The joint along the wall is done last: for an acrylic bath in the gap, for a steel bath with the bath loaded.
Facts about the bath and bathroom for the request
- The material, maker, model and dimensions of the new bath, and whether it has already been bought.
- The material of the old bath, and a panel around it if there is one.
- Whether the tiles in the bathroom are already done.
- The floor, the lift and the turns of the staircase.
- Whether to replace the mixer tap too and where it is: in the wall or on the edge of the bath.
- Photographs: the bath along its whole length, the trap, the mixer tap and the bathroom door.
A shower in place of the bath
A shower in place of a bath has no single figure in the price list, because the work depends on what is under the bath and behind the wall. The price depends on these jobs:
- taking the old bath out and carrying it away;
- what replaces it: a cabin, a tray, or a tiled shower area with a floor drain;
- whether the drain has to change height or place to get a slope;
- whether the water supplies and the mixer tap need moving;
- the floor height and access to the riser.
The cabin work is described on the page shower cabin installation, and the choice between the two on the page bath or shower.
A bath with a new drain: an example
Placing and connecting a new bath is from €60 per unit. If the old drain pipe to the riser has to be replaced, from €30 per connection point is added. Example: from €60 + from €30 = at least €90, labour only; materials are extra. Carrying out the old bath is priced on the call.
Whether the trip is charged separately, the plumber tells you on the call before the work.
Sources
- Ravak: an acrylic bath is not built in rigidly, feet, 2–3 mm gap with silicone checked 16 November 2026
- Ravak: installed in a finished tiled room, opening for access to the trap checked 16 November 2026
- Ravak Rosa: top edge 610 mm ±5 mm, mixer 800 mm, drain 50 mm checked 16 November 2026
- Ravak: fill with cold water first checked 16 November 2026
- Kaldewei: a drain with a double-lip seal checked 16 November 2026
- Kaldewei: load the bath before the joint, check the drain before finishing checked 16 November 2026
- Kaldewei: mortar does not touch the lower edge, installation tape, at the finishing stage, cover checked 16 November 2026
- Kaldewei: limescale with a 1:1 water and vinegar mix, no abrasives checked 16 November 2026
- PTAC: a record with an approved estimate for additional work checked 16 November 2026
- PTAC: a contract can be oral, a written one makes proof easier checked 16 November 2026
- LV portāls: an oral agreement is a contract, proved with messages in correspondence checked 16 November 2026
- The Iļģuciems residential district used only five-storey large-panel sections checked 16 November 2026